Case studies

Real BMS upgrades,measured in uptime and energy.

Detailed write-ups of recent optimisation and controls upgrade projects delivered across London and the South East.

Case study 01

70 Gray’s Inn Road, London

London
Scope
Full BMS optimisation
Floors
Multi-tenant + main plant
Displays
15" tenant touchscreens
Outcome
Reduced energy use

BIAV Controls successfully completed a full BMS optimisation and controls upgrade at 70 Gray’s Inn Road, delivering improvements across multiple floors and the main plant. The project included fault finding, controller replacements, network remediation, software modifications, commissioning, and the installation of tenant touchscreen displays fully integrated with the Building Management System.

Our engineers identified and resolved a number of long-standing issues, including BACnet communication faults, controller instability, network wiring defects, failed field devices, and inefficient control strategies. We also carried out comprehensive optimisation of the heating and cooling systems, introducing demand-led control, outside air temperature lockouts, plant sequencing, and improved scheduling to significantly reduce unnecessary energy consumption while maintaining occupant comfort.

The completed works have provided the client with a more reliable, energy-efficient BMS, improved visibility of plant operation, and enhanced tenant control throughout the building.

BACnet communication faults resolved
Network wiring defects remediated
Demand-led heating & cooling control
OAT lockouts and plant sequencing
Case study 02

Main plant BMS control panel upgrade

London

BIAV Controls successfully completed the upgrade of a critical main plant Building Management System, replacing obsolete Trend IQ3 controllers with the latest Trend IQ5 controllers. The existing control system had reached the end of its operational life, making ongoing maintenance and future support increasingly challenging. Our engineers delivered a complete controls upgrade, providing the client with a modern, reliable and fully supported BMS platform.

Scope of works

  1. 01Replacement of obsolete Trend IQ3 controllers with Trend IQ5 controllers
  2. 02Migration of existing control strategies
  3. 03Installation and commissioning of new I/O modules
  4. 04Full point-to-point testing of all field devices
  5. 05Functional testing of heating, cooling and ventilation plant
  6. 06Validation of alarms, schedules and plant sequencing
  7. 07Software optimisation and commissioning
  8. 08Final testing and client handover

Results

Improved reliability

A resilient, fully supported platform with manufacturer backing.

Faster performance

Quicker processing and more responsive plant control.

Enhanced cybersecurity

Current-generation firmware and network hardening.

Lower maintenance

Fewer interventions and long-term supportability.

The upgrade also delivered greater flexibility for future expansion and long-term supportability. The project was carefully planned and executed to minimise disruption, ensuring the building remained operational throughout.

Before & after

Trend IQ3 to IQ5, side by side.

Drag the handle to see the transformation from the original Trend IQ3 control panel to the latest Trend IQ5 platform — a cleaner, more powerful and future-proof Building Management System, with full control of the building’s critical main plant retained throughout.

Upgraded Trend IQ5 BMS control panel with new controllers and I/O modules after the main plant controls upgrade
Original Trend IQ3 Xcite BMS control panel with legacy controller modules and dense field wiring before upgrade
Before: IQ3After: IQ5

Drag the slider to compare the panel before and after the upgrade.